Conceptual    Overview

Phase 1A

  • Katse Dam (1,950 million m3)
  • Transfer Tunnel (45 Km)
  • 'Muela Power Station (72 MW)
  • 'Muela Dam
  • Delivery Tunnel (37 Km)

Phase 1B

  • Mohale Dam (958 million m3)
  • Interconnecting Tunnel (30 Km)
  • Matsoku Wier and Transfer Tunnel (6.4 Km)

Phase 2 (possible future phase)

  • Mashai Dam (3,306 million m3)
  • Second Delivery Tunnel from Katse Dam to Ash River Outfall

Phase 3 (possible future phase)

  • Tsoelike Dam (2,223 million m3) and Pumping Station

Phase 4 (possible future phase)

  • Ntoahae Dam and Pumping Station