The Mohale Dam consists of the following principal components:

The Mohale Dam contractor is also responsible for the maintenance and operation of the advanced infrastructure in t he Mohale area and maintenance of the Mountain Road from St Michaels to the site.

Construction materials are extracted from quarry 1 and quarry 2, consisting of basalt and doleritic basalt, which serves as the source for rockfill and aggregates respectively.

Main Characteristics

Full supply level (FSL)

2075masl

Minimum operating level (MOL)

2005masl

Probable maximum flood level

2084masl

Reservoir area at FSL

21.2 x 106m2

Capacity at FSL

946.9 x 106m3

Live storage capacity

857.1 x 106m3

Storage at MOL

89.8 x 106m3

Mean annual runoff(March) (1930 - 1996)

317.5x 106m3

Treaty compensation flow

0.3m3/s

Maximum compensation flow at FSL

4.25m3/s

Low Level outlet capacity at FSL

57m3/s

Estimated average annual sedimentation Load

306 000m3

Total Rockfill volume

7.80 x 106m3

Total concrete volume

100 450m3

River Diversion

Number of Tunnels

2

Diversion Tunnel 1: Excavated/lined diameter

5.6m/5.0 m

Diversion Tunnel 2:Excavated diameter Unlined

6.7 m

Diversion Tunnel 1: Length

591 m

Diversion Tunnel 2: Length

674 m

Pre-cofferdam crest elevation

1951 masl

Upstream Cofferdam crest elevation

1967.5 masl

1:5 year water elevation

1967 masl

1:500 year water elevation

1996.76 masl

Fill volume of upstream cofferdam core

54 500 m3

Fill volume of upstream cofferdam rockfill

88 350 m3

Crest level of upstream section of main dam

1997 masl

Tunnel 1 Plug Temporary valve

Type

Number

Diameter

 

Gate Valve

1

250 units

Tunnel 1 Plug Temporary valve

Type

Number

Diameter

 

Gate valve

2

400 units

Senqunyane River Hydrology

Catchment Area

938 km2

1:20 Year Peak Inflow

1 300 m3/s

1:100 Year Peak Inflow

1 979 m3/s

PMF: Peak Inflow (8 hour rainfall duration)

10 519 m3/s

PMF: Peak Discharge (24 hour rainfall duration)

2 477 m3/s

Spillway Characteristics

Approach canal width

60 - 100 m

Spillway type

Ungated ogee

Ogee weir crest length

50 m

Ogee weir crest level

2075 masl

Length from Ogee Weir to Flip Bucket toe

318.1 m

Chute width (Upstream/Downstream)

50/26

Flip Bucket Width

26 m

Ogee design discharge

1 857.8 m3/s

Spillway PMF outflow

2 477 m3/s

Dam Description

Maximum height

154 m

Crest Length between abutment walls

540 m

Crest width

10 m

Top of rockfill(max. section incl. Camber)

2084 masl

Top of rockfill at extreme abutments

2083.5 masl

Top of parapet wall (max. section incl. Camber)

2085.5 masl

Upstream slope

1V:1.4H m/m

Downstream slope

1V:1.25H+berms m/m

Downstream average slope

1V:± 1.45H m/m

Assumed excavation volume

243 000 m3

Rockfill volume: Zone 3B, 3C, 3D and 3E

Zone 2A, 2B and 3A

7.35 x 106 m3

0.35 x 106 m3

Total rockfill volume

7.7 x 106 m3

Face slab surface area

81 000 m2

Plinth length

727 m

Compensation Outlet Data

Compensation pipe diameter

1000 mm slopping

Intake valves: Type

Number

Diameter

Gate

8

600 mm

Maintenance valve for control valve: Type

Number

Diameter

Butterfly

1

400 mm

Provisory closure valve for turbine: Type

Number

Diameter

Gate valve

1

400 mm

Control valve: Type

Number

Diameter

Howell - Bunger

1

400 mm

Low Level Outlet Data

Maintenance Valves: Type

Number

Diameter

Butterfly

1

1 400 mm

Control Valve: Type

Number

Diameter

Howell - Bunger

1

1 400 mm