LESOTHO HIGHLANDS WATER PROJECT

LESOTHO HIGHLANDS WATER PROJECT

Katse Dam Technical Description

Dam

Double Curvature Concrete Arch

Height above foundation 185m
Crest length 710m
Chord length at crest level 605m
Thickness at crest 9m
Thickness at base 60m
Volume of concrete 2.32x 106m3
Cantilever blocks 46No. 15m wide
Lift height 2.5m
Crest elevation(Road) 2060masl
Crest elevation (parapet) 2061.55masl

Reservoir

Total storage capacity 1950x 106m3
Full supply level (fsl) 2053masl
Active storage 1519x 106m3
Reservoir area at fsl 35.8km2
Extreme water level 2060.20msl
Minimum supply level 1989msal
Assumed yield(98% reliability) 18.1m3/s

Flood Hydrology

Status Peak Discharge Volume
Probable maximum flood (pmf) 7874m3/s 780Mm3
1:100yrs return period 5000m3/s 340Mm3
1:10yrs 1200m3/s 87Mm3

Spillway

Maximum discharge(pmf) 6252m3/s
Maximum head on spillway sill 7.20m
Number of bays 10
Width of bay at crest line 15.89m

Low Level Outlets

Number of Outlets 2
Elevation of outlets 1935masl
Diameter u/s 3.8m
Maximum discharge 2x 415m3/s
2No. Radial control gates 3.4 x 2.9m

Compensation & Minihydro

Number of intakes 4 multilevel
Penstock diameter 600mm
Penstock length 150m
Discharge 0.750m3/s
Minihydro Plant Capacity 500kW
Compensation Pipe Flow 0.2 - 0.8m3/s

Tailwater Dam

Mass gravity overflow weir
Sill elevation 1908masl
Height of dam above foundation 32m
Number of bays 4
Width of bay 14.5m
Maximum head on sill 13.30m
Maximum discharge 6252m3/s
Volume of concrete 79000m3

Malibamats'o River

Catchment area of basin 1866 km2
Mean Annual Run-off  at the Dam 554 Mm3
Estimated annual sediment inflow 0.6 x 106m3

Diversion

Rollcrete gravity dam
Maximum height above foundation 35m
Crest elevation 1927.3masl
Spillway section elevation 1924masl
Volume of rollcrete 92000m3
Diversion tunnels 2 No
Diameter lined 7m x 7.5m horseshoe
Length 643m and 598m
Combined discharge capacity 1130m3/s
Bypass gates in tunnel No.2 2 No
Dimensions 2.30x 2.00m
Discharge capacity 100m3/s

Arch Concrete

Required strength 24Mpa @90days
Cemetitious content 220kg per m3 with 70:30 OPC:FA
Max. Aggregate size 150mm
Post cooling 90C

Construction equipment

Tertiary crusher capacity 500t/hr
Batch plant 3x 120m3/hr computer controlled tilting mixer
Cable crane 2x 9m3 buckets Span 1100m
Target placement rate 90000m3/month

Contract Details

Contract awarded to Highlands Water Venture (HWV)

Joint Venture Partners
Company Country
IMPREGILO S.P.A. (SPONSOR) Italy
BOUYGUES S.A. France
HOCHTIEF A.G. Germany
STIRLING INTERNATIONAL LTD United Kingdom
KIER INTERNATIONAL LTD United Kingdom
CONCOR HOLDINGS (PTY) LTD South Africa
GROUP 5 (PTY) LTD South Africa
 

Supervising Engineers: Lesotho Highlands Consultants

Joint Venture  
Company Country
Highlands Water Development Consortium (HWDC) comprising: South Africa
NINHAM SHAND  
WLPU  
KEEVE STEYN  
MJ MOUNTAIN  
SRK  
VKE  
SCBG comprising: EU
SOGREAH France
COYNE & BELLIER France
SIR ALEXANDER GIBB & PARTNERS United Kingdom
 

Contract Sum M793million = US$306million(1990) Commencement February 1991 Taking over certificate May 1997 Costs @ completion M1.4 Billion